fist time took me 2 hours, last time took an hour last weekend
you need a 5/8 plug socket. 8 mil and 12mil
and a short extension,
1. take out intake
2. remove coil packs (12 mil) and egt bracket, dont mix them up there is only one bolt on each and are a pain in the assay to remove and put back on.
3. insert plug socket, insert small extension, then ratchet as there is not enough room to just put it all in at once.
4. reverse 3,2,1
5. remove waster fluid reservoir and battery.
6. remove coil packs. 1 bolt on each.
7. step 3.
8. reverse 3,2,1
9. put it all back together.